University Of Texas Robert B Rowling Hall
The project contractor required LOD 300 concrete model, reinforcement as well as review of Formwork and Rebar shop drawing against our virtual model. The building design showcasing varying elevations within levels had to be virtually modelled to enable clarity to the construction contractor and ensure error-proofing prior to actual construction on site.Identification of 300 potential issues during this virtual modeling effort added value to our client in terms of time and cost.
Concrete Modeling
Precision Modeling of Virtual Concrete models helps us to identify and resolve issues prior to pour on site, extraction of accurate shop drawings and layout drawings and comparison of subcontractor shop drawings submittals with concrete model to confirm fidelity. Identification of issues and resolution has helped us save time and cost for complex projects through early BIM adoption.
Software Used: Revit Structure, Navisworks Manage, Solibri, Bluebeam Revu.
URL: https://vconstruct.wordpress.com/?p=32
Drywall And Ceiling Frame Modeling
Precision Modeling of Virtual Concrete models helps us to identify and resolve issues prior to pour on site, extraction of accurate shop drawings and layout drawings and comparison of subcontractor shop drawings submittals with concrete model to confirm fidelity. Identification of issues and resolution has helped us save time and cost for complex projects through early BIM adoption.
Software Used: Revit Structure, Navisworks Manage, Solibri, Bluebeam Revu.
URL: https://vconstruct.wordpress.com/?p=32